The early 1990s were a time of decline for Victoria generally and Moorabbin especially. Deindustrialisation hit local jobs. St Kilda ceased playing home games at Moorabbin oval in 1992. Instead of it being a convenient stroll from Moorabbin station, 'home' games moved to the inaccessible Waverley Park.
Local government amalgamation was another blow, with the disbanded City of Moorabbin split between Kingston, Glen Eira and Bayside councils. There's a town hall used for shows but it lacks even a public library. The aquatic centre is down the other end of the suburb, in the industrial area. Southland continued to expand, leaping over the Nepean Hwy. Big box retail opened up and down Nepean Hwy between Brighton and Mentone, Moorabbin became little more than the traffic-choked intersection at South Road, to be avoided if possible.
Moorabbin's successful niche
There was one exception to this story of failure. Light industry. Moorabbin, along with Clayton and areas around Dandenong were centres of light and heavy manufacturing in Melbourne's south-east. Moorabbin more smaller scale and Clayton / Dandenong more heavy, including electronics and automotive. The latter slumped when protection wound back from the mid 1970s. Typical industries found at Moorabbin include metals, automotive, building supplies, printing, cabinetry, furnishing, food and more. Also important in the areas's east is 'big box' retail (including op-shops) on Warrigal Rd and the Kingston Centre slightly south of there.
The industrial trades area can be identified by the island of shiny metal roofs in a sea of post WWII tiled houses. It is just over a square mile with none but its western extremity within walking distance of a Frankston line station (most often Highett but seldom Southland and never Moorabbin).
The 'last mile' problem
If there was anywhere that needed 'last mile' access to jobs from a nearby rail line, it would be here. How well is it being achieved? At first glance it looks pretty good with eight bus routes running through or near the area. That's much more than other light industrial areas like Bayswater or Laverton.
But are they useful? Or do they just go through the industrial area because it happens to be on the way to somewhere else? Are local buses job ready? The map below gives a snapshot of issues affecting Moorabbin area routes.
It's not that there hasn't been action on transport; there has been. Except it's been all about encouraging driving via the under-construction Mordialloc Freeway and the long way off Suburban Rail Loop (which won't have a stop in the area). Frequent and direct buses, so important in providing 'last mile' access to jobs and homes, have been the missing piece.
Towards a revised network
A reformed network may be a mix of the above four options. Some changes are relatively logical with few 'losers' while others involve complex trade-offs or interactions with other routes.
Because some of the routes that pass through the Moorabbin jobs area end up 15 more kilometres distant it's desirable that what's done in Moorabbin do not detract from their role further along it. For example it would be poor for a route that is direct and justifies a more frequent service on one part of it be made less direct in another area where a lower service is more justified.
You can reduce the number of network options, and thus the complexity of a reform, by doing the following:
a. Making note of routes that can stay the same as now as they are already useful, frequent and direct.
b. Making certain changes that have so much merit that you'd do them no matter the network options for remaining routes.
The routes you'd keep in their current form are the 824 on South Rd and the 903 along Warrigal Rd. Arguably there may be merit in extending the former to the Brighton area via the 811/812 alignment but this wider change doesn't affect its alignment in the industrial area. You might also add earlier am trips to better suit industrial start times but this is only a timetable change, not a route change. 903 is a also a strong corridor that you'd leave alone.
The above takes care of South and Warrigal roads, to the north and east of the jobs area. Chesterville Rd is to the west of most (though some industrial land uses are west of Chesterville). This is currently served by the 767. This is one of those routes without a train station connection to the Frankston line. It is also only half-hourly off-peak. It could be described as a neighbourhood type route south of Chadstone, with the portion north of Chadstone being a more important route (being more direct and service large destinations like Deakin University and Box Hill).
822 also has its indirectness in the Bentleigh East area though direct roads and other routes exist for network reform to straighten it. As it happens the roads a straightened 822 would run along (Murrumbeena and East Boundary) are exactly half way between the Frankston train line and the Warrigal Rd 903 SmartBus. This makes the 822 a logical candidate for a future upgrade to 10 - 20 minute frequency (as opposed to the current 30 - 60 minute service). Swapping it with the 767 (map below) would extend the benefits of this better service to the Chesterville Rd end of the Moorabbin light industrial area. As well it adds a train station connection at Cheltenham, something that the current 767 does not do due to its Southland bus interchange terminus. (NOTE: Map doesn't show unchanged 824 or 903).
With these parts of the network settled, the loose ends can now be tackled. The most significant of these include:
a. Continued lack of east-west connections from Frankston line stations to the industrial area.
b. Desirability of a more regular service for Keys Rd (also east-west)
c. Connections to residential areas like Clarinda and Clayton (which have a blue collar oriented workforce with significant commuter flows to the area)
The Suburban Rail Loop, starting at Southland, will pass quite near the area. A station is not planned in the area. However a Suburban Rail Loop SmartBus between Southland and Clayton may have local stops. Because of the long spacing between SRL stations this route would remain even after SRL commences operation. A potential SRL SmartBus alignment, based on an extended Route 733 from Clayton, would see upgraded service in Bernard St, about 300 metres south of Keys Rd (map below).
The extended 733 would provide an extra Clarinda/Clayton connection. This would assist access to southern parts of the industrial area distant from the 824 on South Rd. However industrial area patronage wouldn't be the whole (or even a majority) of its usage due to the improved connections between the strong destinations of Monash University, Clayton Station and Southland Shopping Centre. A continuation to Southland station would be highly desirable to provide an east-west Frankston line connection. While the route is on this alignment it would be desirable that it run directly to Sandringham, improving service to another industrial area along Bay Rd. This would provide a new Monash University connection and be more frequent and useful than the existing indirect 822 (or 767 shown on an earlier map).
The network with the extended 733 fixes some issues but not all. For example Keys Rd doesn't have a service along it (although the 733 is nearby). Also there is still a gap in east-west connections. Highett is the nearest station to most of the industrial area. However it has a level crossing. Although buses on Route 708 cross that on Highett Rd, it might not be thought desirable to add another route. Also if buses were run from Moorabbin, scope exists to replace the existing confusing routes 811 and 812 with alternatives, including on the residential Chapel Rd.
Network option A
This option take the above and reroutes 821. Instead of running to Southland it instead operates to Moorabbin Station. Doing so connects this to Keys Rd and services Chapel Rd. The 811/812 can be shortened to operate between Southland and Dandenong only with the Brighton - Moorabbin portion serviced by a westward extension of the 824. The latter would improve off-peak weekday frequency from 30 to 20 minutes. The loss of 821 to Southland would be offset by the new 733 between Clayton and Southland. In conjunction with the unchanged 631 this would maintain two routes between Clayton and Southland.
The revised 821 would likely gain hourly weekend service to retain 7 day service on Chapel Rd similar to what the 811/812 now provides. Scope exists to swap the 821 with the 705 to provide direct access to the Moorabbin industrial area from Springvale and for 705 to enable better Mordialloc - Clayton / Monash access.
Network option B
Another option could likewise replace 811/812 with another route in the area. This might be known as the 826, running between Moorabbin and Southland via the industrial area and Friendship Square in Cheltenham. This could enable the southern part of the 631 to be deleted, with the service replaced in the Clarinda area by the extended 733 and potentially a re-aligned 824. Again the latter would need to be extended to Brighton to replace the deleted part of the 811/812. 821, which runs through a large 'dead' catchment might still need to be upgraded given the loss of the 631 on Kingston Rd.
Conclusion
Two bus network options for the Moorabbin industrial area are offered. Either will involve extra buses and extra costs versus the existing network. However it should greatly improve connectivity to local jobs and deliver other benefits well beyond its area, including support for the Suburban Rail Loop.
Which option do you prefer? Or maybe there's another that offers further advantages? Comments are invited and can be left below.
More Building Melbourne's Useful Network items are here