Tuesday, June 07, 2022

TT #166: What's happening to our tram timetables?


Up to now Melbourne has largely avoided COVID-related public transport service cuts (except instances such as at V/Line and Dysons where drivers were available and temporary cancellations applied). 

This is unlike central London for which large bus service reductions are proposed. 

However we're not getting off scot free. Last Tuesday's Age warned of cuts to trams on Elizabeth St and St Kilda Rd routes. These would save $4 million per year by making what is termed 'minor reductions' in frequency during shoulder peak times. That includes just before and just after the evening rush hours, extending into the early evening. Lower than expected passenger numbers (due to the pandemic and people working from home) was given as a justification.  

The information came to light in a response presented by the Department of Transport to PAEC (Public Accounts & Estimates Committee). This refers to funding for a tram service increase in 2018 lapsing in 2021/22. This (pre-pandemic) 2018 boost was to address crowding and impacts of Metro Tunnel construction work. The government did not seek a renewal of funding for this upgrade due to lower patronage and less construction impact. Hence the services added four years ago will be withdrawn. 

Or will they? Response h above refers to minimising negative impacts. 

The response is that DoT is considering scope for network efficiencies and reducing what it terms 'under-utilised' services. 

So there is a chance that not all the services added in May 2018 will be withdrawn if quieter alternatives to prune back are found. Or efficiencies are found. Possibilities are shown below. 


What is chosen depends on your aim when developing or reforming a network. Last week I argued that frequency is everything despite it often being ignored or at best under-appreciated by the Department of Transport / PTV. 

I also suggested that frequency should drive every decision in public transport planning. Including whether to go ahead with these cuts (if it's a straight reversal of the 2018 upgrades) or seeking more tolerable alternatives. The latter could be based on preserving maximum waits for as much of the day as possible on as many routes as possible. Ideally these should be 10 minutes, though St Kilda Rd routes  don't even meet this now. Or, where frequency is currently lower, like in the early evening, at 15 rather than 20 minutes. 

The best option of course would be to cut nothing and instead look at ways to economically increase rather than cut overall network frequencies. On this note the long-term trends. Despite being a key driver of patronage tram frequency has been neglected for decades. Timetables have suffered 'death of a thousand cuts' over decades (most notably the 1950s and 60s with few reversals since) and we now wait up to twice as long for trams as our grandparents did. 

The longer any planned service reductions are deferred the better. It is possibly not a bad thing that we haven't been told about what is happening and when it will be happening. That might be sign that there might be deeper thinking happening than merely removing the service that got added in 2018.  

The 2018 service boosts

So what are the May 2018 service upgrades that may be reversed? You can read about them here or below. 


Note though that the Age article only refers to Elizabeth St and St Kilda Rd services. Thus the cuts may not affect the 58 and 86 mentioned above. Tram route and frequency guides are published on Yarra Trams website here. However there were enough discrepancies between these and actual timetables that I gave up using them. 

The tram 67 example below shows the 2018 upgrade in the early evening outbound direction. In 2017 the service was every 12 - 15 minute until 7:34pm. It dropped to every 17 minutes for a couple of trips before settling down at the 20 minute late evening frequency at 8:26pm. 

In contrast the 2018 boost extended the 15 minute service by about 90 minutes to finish at 9:08pm after which frequency reverted to 20 minutes. This was achieved by adding two tram trips. It meant that people could eat out in the CBD and have a 15 minute maximum wait until after 9pm. 


The 67 was a St Kilda Rd route. Let's look at an Elizabeth St route, like the popular 59 to Airport West via Niddrie (in the minister's electorate). In 2017 the 59 had a good interpeak frequency but fell off in the evening. For example it ran every 10 to 12 minutes until 7:43pm. Than only every 20 minutes from 7:57pm. Trips around then were crowded but little was done to boost timetables for years.  

Relief came in the 2018 upgrades. Added short trips (finishing at Essendon depot) delivered a 5-10 minute frequency until after 7;30pm. Service after then was upgraded with 15 minute maximum waits until 9:58pm, after which the usual 20 minute evening frequency cut in. 

This upgrade was much larger than that which the 67 received, with 7 trips in the outbound direction alone added. Consequently reversing the 2018 upgrades will have a much bigger effect on the 59's usefulness than doing same to the 67. Having said that scope might exist to make peak period adjustments to the 59 where frequencies are very high while retaining 10 minute maximum waits until 7:30pm and 15 minute maximum waits until 10pm. 


The above are just two examples. I haven't looked in detail at the consequences for other tram routes nor at different times in different directions. However it is clear that if the 2018 upgrades are fully reversed their effect will be substantial. Certainly more than 'minor reductions' for routes like the 59. 

Conclusion

Service cuts to public transport must only ever be a last resort. It is supply led. Cut frequency and you will cut usage. Especially when we're talking about routes that serve corridors with a strong propensity to use public transport for diverse purposes throughout the day such as many of our trams in denser areas. Cuts in off-peak frequency are particularly to be avoided while small peak reductions (where the service remains 'turn up and go') may go un-noticed.

Consequently simply reversing the 2018 upgrades wholesale without considering alternatives such as adjusting peak period service levels only or wider network reform would not constitute sound planning in this regard. 

Friday, June 03, 2022

UN 128: Melbourne public transport's almost unspeakable word


What word am I?

Nothing else is more influential when it comes to getting more people using public transport. 

Almost alone, I determine whether our buses, trams and trains are useful or not.

Despite this, DoT/PTV only rarely sell my benefits. That holds across all audiences, whether it's promoting service upgrades to the public or (apparently) briefing the minister eg for PAEC hearings.

I start with F. 

I am frequency. 

You could say I'm Melbourne public transport's almost unspeakable F-word. 

I'm so unmentionable that if talked about at all it's only in the most abstract terms (eg extra trains per week) rather than something more day-to-day useful like minutes. Like a messiah, my coming is often conditional. In this case, only after infrastructure projects (on which I mostly do not depend) get finished. 

Nothing else is so important yet has had so many excuses made on why you can't have much more of me in Melbourne. In fact the most recent news is about less of me for trams. 

Even though it is me who should drive every decision made in public transport. Whether it's about infrastructure, networks, service reform and staffing. And ideally DoT/PTV bosses would promote upgrades made to me hard, living as though they'd lose their jobs if patronage does not respond.   

Why is frequency key to public transport ridership? 

Walkers, cyclists and drivers start moving immediately they decide to go somewhere. Whereas transit riders instead must wait for their bus or train to show up. If services are infrequent then that initial wait, and those for any subsequent connections, can easily double or triple total travel time, especially for local trips. It is this, more than in-vehicle travel time, that makes much public transport too slow.   

An analogy, credited to Jarrett Walker, is that having an infrequent bus is like having a gate at the end of your driveway that only opens once an hour. That would be hugely inconvenient, no matter how fast you could drive once you left your gate. The biggest benefit to your mobility then would be getting the gate to open more often. Frequency is freedom as they say. 

Public transport has numerous such gates with waits. Not only at the stop you board but also at every  location you need to change. That's inevitable as being able to reach every wanted destination on one fast direct route is geometrically impossible, especially in a large city. So you need good connections for it to be useful for all but a few trips. 

We know that more frequency makes public transport better for existing riders with improved overall speed, connectivity and reliability. Does providing such a better service attract more usage and if so by how much?

A 2010 ATRF paper by Graham Currie and Alexa Delbosc (both of Monash University) found that it did. They compared premium bus offerings in Adelaide, Brisbane, Sydney and Melbourne. The first three had significant bus infrastructure (eg O-bahn, busways, T-ways). Melbourne's SmartBus routes had way less infrastructure but more service, with a 15 minute weekday frequency typical. 

Guess what? Melbourne's approach won more passengers.

Currie and Delbosc found that frequency was by far the biggest influencer of bus ridership per route kilometre. Melbourne's service-heavier SmartBus performed better than infrastructure oriented routes in other cities. While desirable for other reasons, infrastructure, bus accessibility and catchment population density, hardly figured. 

The research can thus be summarised in just three words. Frequency is everything. 

Or, to put it another way, you can do other stuff with buses, but you need frequency to really succeed. 

My personal view is that you do transport service in this order: Coverage > Span > Frequency > Speed. That is you get the previous to be at least OK before spending big on the next. Here in Melbourne we're pretty good with network coverage but have issues with span and frequency on many bus routes. So we sort out those along with some network reform (that also helps a bit with speed). 

Then once that's pretty good we can do BRT-type speed-up projects (like Bus Wormholes) for the next upgrade stage. The increased speed generates returns that can be reinvested for even more frequency, so usage rises again.

The Currie Delbosc paper also found that transport is supply led. Add road capacity and you get more people driving. Add public transport service and you get more passengers. Both are examples of induced demand. In transport what you get depends on what you fund. 

ATAP, the Australian Transport Assessment and Planning guidelines (p7) indicate the link between increased service and higher patronage. Transport for NSW economic parameter values (p45) confirm this with the greatest patronage elasticity being when off-peak service is boosted. In the long run you can expect passenger numbers to be proportional to service km added as an average.  Here in Melbourne this was attained in 2006 - 2010 where bus service kilometres and patronage both rose by about 25% under Meeting Our Transport Challenges.   

Even a 1:1 increase can improve the cost-recovery ratio as more passenger fares help defray the fixed component of costs. This is most likely during off-peak times where the existing bus fleet is worked harder, attracting higher revenue per bus. But even better results should be possible when frequency is accompanied by network reform as we saw in areas like Brimbank and Wyndham. As for trains, with track and signal infrastructure to maintain, railways have a high proportion of fixed costs, making the financial benefits of higher usage even more notable from low marginal cost off-peak improvements.  


Why do some people say we can't have frequent service?

Despite frequency's uncontestable benefits, there's people who say we can't have it or it's too expensive.  Here's six common objections to frequency and why they're (mostly) wrong. 

1. We are not densely populated enough. This is based on public transport being demand rather than supply driven. As noted before, the latter is more often the case, at least in built-up areas. Anywhere  where there's traffic congestion or parking pressures there's scope for public transport service upgrades.  

2. People love their cars. Where they have a choice people will use whichever transport is most convenient. Where they don't have a choice and the available option is poor they will probably lessen  use of it. Transport improvements will cause an increased take-up on the mode that gets improved. That includes public transport if frequency is boosted. 

3. We don't have enough trains, trams and buses. Except in some fringe areas this is largely not the case. The greatest need for frequency, and the most economical time to provide it, is in off-peak periods. In most cases such an increase is possible by working the existing fleet harder for more of the week. Only when you want higher peak frequencies and for this to extend over a wider area (like might be done in a subsequent upgrade phase) do we need fleet additions, most notably for buses. 

4. We don't have the rail infrastructure. Correct on some outer single track portions of the rail network. But most of Melbourne's suburban network is double track or better. 10 minute service to most stations on most lines is possible on the existing infrastructure, as we know from existing peak timetables.  

5. We still have too many level crossings and boom gates would be forever down. Likely true if peak frequencies are increased on busier lines. However the greatest need is off-peak frequency. With widespread 30 - 40 min gaps between trains, large scope is possible to upgrade to 10 - 20 minute off-peak frequencies without imposing unacceptably long boom down times. 

6. It costs too much. More frequency needs more drivers and more scheduled service kilometres. These impose ongoing rather than largely one-off costs as with infrastructure. Treasuries, in particular, don't like this, despite all the permanent jobs created (which Labor governments, especially, love to quantify and spruik). However the benefits from investments in service increase are high with at least 5:1 recently quoted by Minister Ben Carroll for buses, especially in areas ripe for network reform (with partly offsetting savings possible in some places). 

Higher train frequency would create a robust spine for the network that we currently don't have in suburbs like Croydon and Bayswater where they currently only run every half hour interpeak. The good news for Metro Trains is that just a tiny increase in scheduled services (eg 1% or preferably 2 - 3%) can deliver big upgrades like halving maximum waits at popular travel times. Where it merely comprises working the existing fleet harder on existing infrastructure, the incremental costs of adding frequency is relatively small due to the relatively high fixed costs of railways. And it would generate higher usage which spreads costs across more passengers. 

Organisational distraction: A past problem and present threat

I listed five impediments to bus service reform in a talk to Melbourne University students here. 

Another issue is focus. Does the Department of Transport adequately advocate frequency's role internally when seeking funding for service upgrades? And if they do get funding do they (PTV) promote it to maximise usage and benefit from the investment made? Both must start with an understanding of frequency's transformative power so they can advocate from a position of conviction, strength and evidence. I'm not sure that this is necessarily yet the case for everyone within DoT.   

Under successive governments DoT and their predecessors have not been immune to wasting time on badly managed, ill-advised or dead-end projects of marginal benefit to passengers. Only occasionally have they had clear air to attend to network building basics. Even rarer is roll-out at the metropolitan-wide scale and pace needed. 

For instance ongoing difficulties with three awkward ticketing systems (scratch, Metcard and Myki) sapped attention for decades. As did issues with operator franchising in the 1990s and 2000s along with their many associated unnecessary rebrandings. More recently there's been a lot of interest in (admittedly worthwhile) infrastructure (although much is hived off to other authorities). Then there's the almost continual restructurings that cause a harmful internal rather than external focus. Even good people can get sidetracked in this manner as manufactured urgency overtakes what's important. 

The Department of Transport can only juggle a few balls at a time. Network planning and service reform has come a poor last in much of the last thirty years due to all the other distractions. This is despite its decisive effect on how useful the network is for the trips people wish to make. 

Behind the scenes it's also important for DoT to convince others of transport's supply-led nature (with implications not only for the benefits of public transport frequency but also the sustainability of congestion relief delivered by major road projects due to induced traffic and the Jevons Paradox).

Benefits of focus

Places like Perth have had a public transport bureaucracy that has been tightly focused on the things that matter. For example there have been no major system renamings since 1986, ticketing has rarely made headlines while operator contracting seems uncontroversial with privatisation accorded its rightful place (ie unimportant compared to service design and delivery). 

Consequently Perth has succeeded at doing more network reform over more years without big backdowns like we saw in Adelaide. This is under both parties of government even when operational funding is limited. As it is now under its heavily infrastructure oriented state government. This is like Victoria but with a 3 year lag as premier McGowan only won office in 2017 and immediately started copying Andrews virtually word for word in transport policy and projects.  

One can only hope that from experience our Department of Transport has learned what is productive and what is not. However the risk of its bosses (who don't all have a transport background) falling for cargo-cult distractions that stop them picking up the (now dusty) ball marked 'good service basics' and redressing a 30+ year backlog in  bus network reform remains high. 

So-called 'demand responsive' or 'flexible route' buses are the current fad. Despite abandonments elsewhere and high per passenger costs limiting scalability, they attract disproportionate unearned attention from senior DoT officials. This is not a rational choice given the pressing reform needs for fixed routes and their greater wider benefits if done. 

A misplaced focus can colour the advice received by Minister Carroll and skew what he speaks of as being important. DoT advice hasn't always served Labor state governments well, as Joel Deane's Catch and Kill reminds us. At the very least it could be desirable for the minister to seek advice from lower levels in the Department where more reality-grounded views may be found. 

And how do you maintain focus? That needs the word we mentioned before. When the value of frequency becomes recognised such that it is no longer so unspeakable we'll know that progress has been made.   

More Building Melbourne's Useful Network items here

Tuesday, May 31, 2022

TT #165: The 850 Glen Waverley to Dandenong connector


Many eastern Melbourne middle-suburban centres have bus routes running between them. They often provide diagonal connectivity to complement the area's mostly grid-based network and improve transfer-free access to the larger centres. Examples include routes like 738 (Mitcham - Knox City) and 742 (Chadstone - Ringwood). 

Another example is Route 850 between Glen Waverley and Dandenong. Shown below, key intermediate destinations include Brandon Park Shopping Centre and Waverley Gardens. 


It's hard to see on the network map below, but not much of Route 850 has unique coverage. Key overlaps include with 742, 885 and 902 on Springvale Rd, 862 on parts of Wellington, Jacksons and Police roads and 804 on Gladstone Rd. There is unique coverage on Brandon Park Dr but the nearby parallel Monash Freeway limits walking permeability. Otherwise 850's strongest areas were it's the only route are on Menzies Av and James St in Dandenong. 

Route 850 serves several state seats including Mt Waverley (Matt Fregon MP), Mulgrave (Daniel Andrews MP) and Dandenong (Gabrielle Williams MP). Mt Waverley is considered marginal with the others considered safer. However recent elections (eg 2018 Vic state and 2022 federal) have redrawn the political atlas with large anti-Labor swings in some of these 'safer' seats despite overall Labor victories. The common thread, whether it's areas as diverse as Melton, Kooyong or Fowler, is that voters hate being taken for granted.  


Timetable and service levels

A large stretch of suburbia between Mulgrave and Dandenong has many bus routes that (at best) operate hourly and lack weekend service. This is despite favourable catchment demographics and strong patronage on the trips that do run. Even the otherwise comprehensive 2006 minimum service standards upgrades extended to less than half of the area's routes.   

This pattern continuing to this day. Whatever shortcomings premier Daniel Andrews may have, pork-barrelling in his own seat of Mulgrave with regards to bus services is not one of them. In fact it is hard to find anyone who has benefited less from his government's transport agenda than local bus users. Such populations, once considered reliable Labor voters, are no longer necessarily so, as this year's federal election results showed with large anti-Labor swings in 'left behind' low income catchments.   

The 850 bus, however, is better than most. Unlike many nearby routes such as 800, 802, 804, 814 and 885 it runs seven days per week. Finish time is around 9pm as, unlike those just mentioned, it gained upgrades to 'minimum standards' about 15 years ago. 

Also, apart from the area's widely spaced SmartBuses, the 850 wins on the frequency stakes too. On weekdays interpeak it runs a clockface 30 minutes, beating the more common 40 - 60 minute frequencies on local routes like 813, 848 and 862. Morning peak waits are a little longer, with non-clockface 32 - 33 minute frequencies typical, possibly due to traffic delays. Also weekday starts are somewhat late for a minimum standards route with the first arrival at Glen Waverley not until 6:44am. 

Weekends, as normal for buses in the area that run, has close to a flat hourly frequency. Last buses leave Dandenong and Glen Waverley just after 9pm on both days. However, like many former Grenda group services, Sunday starts are late, with the first bus getting people to stations not much before 10am. This was an austere interpretation of the 2006 minimum standard which specified a 9am start. 

Even 9am has been realised as being too late for many travel needs with some local bus routes starting at around 8am or before. Particular effort to improve early Sunday services was made recently in Craigieburn where earlier Sunday trips were added on several routes. A good example is Route 529 whose first Sunday trip now arrives at Craigieburn station before 7:30am.  

Travel time from Dandenong to Glen Waverley is slightly under 60 minutes most times. This means that the 850 uses four buses on weekdays and two buses on evenings and weekends.  

History

Route 850 is a long-standing route that has seen minimal change over the last 50 years. Network maps show it first appearing in 1972. Then its alignment was slightly different in the Dandenong North area, with the later discontinued Route 847 taking its place on James St. 

The most significant change occurred about 15 years ago, when the 850, like many others across Melbourne, gained longer operating hours including new Sunday service as part of 'Meeting Our Transport Challenges' minimum service standards upgrades.

The Manningham Monash Whitehorse metropolitan bus service review from April 2010 recommended that Route 850 be rerouted via the Waverley Park housing development to improve coverage. It also considered Route 850 to be significant enough to be included on the Principal Public Transport Network of major routes with more frequent service. However, like many other review recommendations, neither happened.  


Usage

You might think that Route 850 wouldn't get much usage given all the overlaps it has with other bus routes. However much of its catchment demographics are so good that you can throw bus service at it and people will use it anyway. Boarding numbers reflect this strength. With passenger boardings per service hour at 31 (weekdays) and 26-27 (weekends) it is an above average performer for buses in Melbourne. 

Other factors that help include its strong termini at both ends, reasonable directness and higher service levels than other routes in its catchment. 

Conclusion

Despite overlap with other routes, the 850 serves a useful function. While those travelling direct from Dandenong to Glen Waverley stations might get the train to Springvale and then the 902 to Glen Waverley (about 45 min), those who want to start from Dandenong North might prefer the 850 rather than backtracking. The route also serves some medium sized destinations, often being one of the few 7-day routes along the way. 

Due to overlapping in areas like Mulgrave and Dandenong North there may be scope to reduce the number of bus routes while increasing their frequency and operating hours. The area has not had significant bus network reform for decades and is overdue for it. But no matter what happens it is hard to see a future reformed network that does not keep the 850 in a form at least similar to now, likely with increased frequency.  

Thoughts on the 850 and its future are appreciated and can be left below. 