Tuesday, October 12, 2010

Our first ten minute line

Sunday marked the start of a new timetable for several Melbourne suburban rail lines. The revised timetables feature increased weekday peak services on some busy lines and six car rather than three car trains on others to lessen crowding. Metro Trains website item explaining the changes is here

However the most important change in terms of how passengers will view and use the train network is the new Frankston line off-peak weekday timetable. This sees train frequencies increased from every 15 minutes to every 10 minutes. And weeknight 7 - 10pm headways are down from 30 to 20 minutes, reversing most of the 1978 evening service cuts.

Even though government transport plans normally stress infrastructure over service levels, there is no question that the October 10 timetable is significant for several reasons:

Firstly it makes Frankston the first railway line to operate at a tram-style 'turn up and go' frequency (Werribee's 6 trains/hour doesn't really count due to its uneven headway). In doing so it challenges an oddity where trams run more frequently than trains, despite rail's larger catchment area, coverage of major suburban centres and greater importance of connectivity with buses.

This upgrade provides a service at least every ten minutes for the 26 stations from Frankston to Richmond. Beyond Richmond the service frays into two patterns - one via the City Loop and the other direct to Flinders Street. Like the current Werribee operating pattern, these alternating services reduce legibility and effective frequency in the CBD, so are hopefully an interim transitory step before a single operating pattern can be introduced.

Secondly, while not marketed as such, it is understood that these trains form a direct Werribee service, allowing a one-seat ride from Frankston to stations such as Footscray, Newport and Laverton. Through-routing like this was typical before the Loop commenced, so this change represents an element of 'back to the future'. Linking the Werribee and Frankston lines could improve travel speeds for cross-city trips, but care will need to be taken to avoid Werribee's reliability being dragged down by Frankston line problems (and vice versa).

Thirdly is the decision to choose the Frankston line. If you were choosing which lines deserved a higher off-peak service on the basis of likely patronage increase, the Frankston line would be unlikely to figure. Instead the lines to Ringwood, Dandenong and probably Sydenham might have a greater call. These lines have all have large middle suburban trip generators, including universities, that generate off-peak and counter-peak travel. The very high concentrations of low income earners around Sunshine - St Albans and Noble Park - Dandenong (Sydenham and Dandenong lines) also tend to generate high off-peak demand outside commuting hours.

Nevertheless the Frankston line off-peak is not what you'd call a quiet line like Williamstown, Alamein or Sandringham. It has operational advantages such as the ability to run through to Werribee. And as an experiment certain changes (eg to loop running patterns) might not be as controversial as one conducted on a busier line.

Fourthly, the change is reversing a significant decline in overall Frankston line service, both in absolute and relative terms.

The absolute decline has been in reliability. While this has occurred across the network, factors such as Siemens trains (and their speed restrictions), the number of level crossings (and consequent disruptions) and it being part of the busy Caulfield group, the Frankston line is particularly prone to delays. In rough figures, Frankston passengers experience twice as many late trains than the Melbourne average, and nearly three times as that on reliable lines such as Glen Waverley.

The relative decline can be measured against the Cranbourne and Pakenham lines, Frankston's sister lines on the Caulfield group. In the 2004 - 2009 period Frankston tended to miss out on additional services. Those that were added went to the busier and faster-growing Pakenham and Cranbourne lines instead.

June 2010 saw renewed interest in the Frankston line, with a new timetable adding peak services. While there remain timetable 'holes' of 15 minutes or more, most Frankston line stations got at least a 10 minute service, with busier stations at a five minute peak frequency approximately. The trade-off was that most of its express trains ran direct to Flinders Street instead of via the loop - speeding some but slowing others.

This interest is continuing, with this week's 50% off-peak frequency increase for all Frankston line suburban stations. The significance of this can be measured by reviewing previous service changes of similar magnitude. The last would have been back in the 1990s, where off-peak weekday services on some south-eastern suburban lines went from 20 to 15 minutes. Subsequent increases tended to favour Sundays, late evenings, peak periods or parts of lines only, leaving basic Monday - Saturday off-peak and evening service levels intact up to now.

Conclusion

The Frankston line presents both challenges and opportunities for Metro.

Challenges because its low on-time performance consistently drags down the metropolitan average, and thus the ability to meet targets.

And opportunities since the October 10 Frankston timetable is the first test of Metro's vision for a frequent-service metropolitan railway.

Sunday, October 10, 2010

New Metro timetable starts today - 285 new weekly services for Frankston, Craigieburn, Sydenham and Werribee

These were implemented several weeks before the 2010 state election. They include a major weekday off-peak frequency upgrade for the Frankston line. However there was a complex half and half pattern. Weekends remained at every 20 min but their timetables were to be upgraded to every 10 min a couple of years later. 285 weekly services, with 45 of these during the peak, were added. 

Excerpt from Metro website: 

The changes mainly focus on the Craigieburn, Sydenham, Werribee and Frankston lines, however, more services, greater capacity, and altered running times are among the changes being made on other lines.

The major improvements include:

• The Werribee line gains four new peak services each weekday, while the busy Sydenham line receives three peak services each weekday, and the Craigieburn receives two new peak services each weekday.

• The Frankston line will increase its service frequency from 15 minutes to 10 minutes between 8:45am and 4:15pm each weekday. Half of those will run via the city loop, and the other half will run direct to Flinders Street. Service frequency in the evening will also increase on the Frankston line, reducing from the current 30 minute frequency to a 20 minute frequency after 7pm.

• The Epping, Hurstbridge, Belgrave, Lilydale and Glen Waverley lines will benefit on weeknights and weekends, with most services gaining an increase in capacity, running as six-carriage trains instead of three-carriages.

These changes are Phase 2 of the 2010 Metro timetable changes. Phase 1 in June 2010 concentrated on the Frankston, Pakenham and Cranbourne lines. The advice given to passengers about Phase 2 is below. 
https://web.archive.org/web/20101015005857/http://www.metrotrains.com.au/About-us/News/New-timetable-from-Sunday-brings-285-extra-services-a-week.html

To explain the changes Metro set up a 'Destination Better' website. This has a clickable map with details about changes on each line (which still works in the archived version). See it here: 
https://web.archive.org/web/20101022063604/http://destinationbetter.metrotrains.com.au/

See blog post from 12/10/2010 for more information. 

Note: This item was added retrospectively for posterity. 

Monday, October 04, 2010

DART’s first day

Without the speeches, balloons and sausage sizzles that normally accompany a railway extension, today marked Day One of DART, or Doncaster Area Rapid Transit.

DART is a four-route SmartBus network serving Manningham (Routes 905, 906, 907 & 908). It’s the government’s response to calls for a railway, which would have been dearer to build and directly served a smaller catchment area.

Poster in bus

Demographics

Manningham is predominantly middle to upper class. There is a high representation of professional two-income families. Housing is predominantely detached with parking for two cars. Nevertheless new townhouses are also popular in the areas nearer the CBD (being larger than a flat or villa in the nearby blue-chip suburbs of Kew and Balwyn).

Like other north-eastern suburbs Manningham lacks a large body of low income earners. These mostly settle in other parts of Melbourne which are better served by cheap rental properties and (up to now) better public transport. It does however have a substantial immigrant population (particularly from Asia) who tend to share (if not exceed) the middle class incomes and educational aspirations of the general population.

Manningham has no substantial industrial base, with most local employment being retail and services. There is also significant commuting towards the CBD, made possible by a freeway and express buses.

It also has no university campuses, though education levels and aspirations are high. This would tend to indicate significant commuting for education puposes.

Like many other parts of Melbourne, the baby boomers who settled Manningham are ageing. However average life expectancies and health standards are above average, so the majority are likely to be active and mobile well in to their seventies and eighties.

Doncaster Park & Ride

History

In the late 19th century a short-lived tramway ran between Box Hill and Doncaster, and the road between them retains that name. Market gardening was a dominant land use and the area did not become heavily urbanised until after WWII. However comparative closeness to the CBD, proximity to the Yarra, elevated views and the rise of the motor car (which made the lack of a railway less of a hindrance) contributed to Manningham’s growth in the 1960s and 1970s. It was part of a large belt of emergnig eastern suburbs between the railway lines and beyond the tram tracks including suburbs such as Forest Hill, Glen Waverley and Wheelers Hill. Traces of Templestowe’s rural past are evident today in its acre lots and lack of kerbing on some roads.

The Doncaster railway was part of the 1969 Metropolitan Transport Plan, which set the agenda for road building over the ensuing 40 years. Recent rail extensions have all been electrifications of existing rail corridors rather than new lines. And where new lines are proposed, they are either for growth corridor outer suburbs or underneath dense city land uses. And so all of Manningham’s public transport task is handled by buses, operating either to the city via the freeway, local shopping centres or railway stations in adjacent corridors.

Before SmartBus and DART, major bus routes in Manningham typically operated every 30 minutes on weekdays and roughly hourly on weekends (though some routes had two hourly or no service). This network was augmented by peak hour freeway express services and a fairly new circular shopper route.

DART represents a doubling of service frequency and later finishes on major routes. The four DART routes and two orbital routes (which started earlier in 2010) offer a SmartBus level of service (15 minutes weekdays/30 minutes evenings and weekends). This frequency is similar to suburban trains on weekdays and less on weekends. DART spans are broadly similar to trains except for the early finish on Sunday. The upgraded routes also had their numbers changed (from 300 series to 90x series) to reflect SmartBus route numbering.

Some existing routes were changed to reflect DART’s coming, but others were not. Hence there are some overlaps between regular routes and the upgraded SmartBus services.

City terminus near Southern Cross Station

The DART Test

The introduction of DART (and intersecting orbital routes) present opportunities for examining what happens when you (effectively) double transit service, especially in an area that lacks some of the demographics conducive to usage and starts with some handicaps for this.

Manningham’s limited public transport, low population density (especially in Templestowe) and high car ownership has historically resulted in a modal share lower than suburbs served by rail.

Demographics such as high workforce participation and lack of a local university tend to lower average occupancies in between the peaks. This produces a commuter pattern more like the Sandringham line (quiet interpeak) than the Dandenong or Sydenham line (busy day and night).

Secondly, unless regional centres such as around Shoppingtown and The Pines are built up patronage is likely to be unidirectional, lessening efficiencies, even if services in the peak direction are well used. This is different to (say) an orbital or cross-suburban bus between two railway lines which will attract patronage in both directions at any time.

My hunch is that DART will bring a substantial patronage increase, as it deserves to do so. However due to less favourable demographics (ie wealthier with more choice), I suspect that patronage elasticity per service kilometre added won’t be quite as high as we've seen on the three orbital routes and certain local upgrades.

Doncaster area frequent service map