Friday, November 27, 2020

Building Melbourne's Useful Network Part 71: Better transport for Melbourne's new social housing growth areas


A major part of Tuesday's Victorian state budget was a social housing package. The headline numbers include a $5.3 billion spend for 12 000 housing units. I will not go into the intricacies of these arrangements. Nor will I dwell on the distinction between social housing and government-owned and lower rent public housing. However the initiative does mark a substantial increase in activity in a portfolio that Victoria has for several decades paid little attention to (even compared to other Australian states). Welfare advocacy and housing groups have generally praised this new attention.  

The main housing announcement came out a few days before the budget. The first sites to be developed will be in Heidelberg West, Ascot Vale, Flemington, Hawthorn, Richmond and Ashburton. No doubt there were other reasons to choose them but these locations are reasonable choices for low income people who may not own cars.

For example all are handy inner to middle distance suburbs and have at least reasonable public transport in some directions. Many needed services are within a 20 minute ride on public transport running every 20 minutes or better (at least on weekdays). Apart from the socio-economic diversity that the new housing might incorporate within them, these locations all abut higher income areas, something that's desirable to avoid large geographical concentrations of disadvantage. 

The maps below show the current Public Transport Useful Network (ie service every 20 minutes or better) in the six abovementioned areas proposed for redevelopment. Click for a sharper view. 

The rest of this item will propose service improvements, mostly to buses, by area. These are needed to complete sometimes disjointed networks or correct timetable irregularities. These should provide a good return in the form of increased patronage since areas with high densities of public and social housing tenants are conducive to high all-day public transport usage. 

West Heidelberg

Most of the area is fortunate to be near a long hours bus route (250) and a SmartBus (903). However weekend frequencies are still quote low. There is some poor legibility caused by limited service on routes including 350 and 550 in or near the area.  Recommendations include: 

* Add after 9pm Sunday service and increase weekend frequency on Route 903 SmartBus from 30 to 20 minutes or better. Even better and potentially cheaper is to replace Route 903 with a Route 904 Megabus operating every 10 minutes (with knock-on improvements for La Trobe University if the 903 SmartBus is extended there).  

* Increase Sunday frequency on Route 250 (and hence also Route 251) to 30 minutes (to provide a 15 minute combined service on the common section). 

* Reform local buses including Route 350 and 550 as per the VTAG publication Networking the North with simpler service and seven day operation.  

* Upgrade weekend frequency on Route 513 and extend operating hours to provide parts of Heidelberg West with a more direct connection to the west. Because it can go two possible ways east of Rosanna, the 513 is currently a very confusing route. Service upgrades should preferably be done in tandem with network reform such as proposed in Networking the North eg having all 513 trips going via a single simple path to Greensborough.  

Ascot Vale

The main public housing area is a bit away from the railway. Two tram routes operate though Route 82 is a 'Cinderella' route, operating less frequently than other tram routes. This is due to ancient history, namely that 82 is a tacked together remnant of the old Footscray tram network, and the lack of subsequent reform. Bus route 472 is the nearest public transport to many homes. It runs to a good 15 minute frequency during the day but services fall sharply at night and on Sundays to approximately hourly.  Recommendations are as follows: 

* Reshuffle and add a few early evening trips on bus route 472 to improve evening service from every 60 to every 30 minutes. 

* Boost bus 472's Sunday frequency from every 50 minutes to every 20 to 40 minutes with an earlier am start. 

* Boost weekday frequency on Tram 82 from every 20 to every 10 - 15 minutes (noting that weekend frequency is currently better than weekdays at every 15 minutes). 

* Boost Sunday morning and evening frequencies on trams so intervals are never more than 20 minutes (currently 30 min maximum waits are common). 


Flemington

Area has substantial train and tram services. However, as is common, especially in northern and western Melbourne, evening and Sunday morning trains only come every 30 to 40 minutes. Long waits even on our main lines stymie access to many casual jobs that typically involve night and weekend work. There could also be some connectivity benefits of upgrading the nearby Route 404 bus to Footscray and Moonee Ponds. Suggested upgrades are as follows: 

* Upgrade Craigieburn and Upfield line evening train frequency from every 30 to every 20 minutes and Sunday morning frequency from every 40 to every 20 minutes. Both upgrades would have far wider community benefits than just for the social housing developments discussed here. 

* Upgrade bus route 404 to operate (a) 7 days per week, (b) over longer hours with a 9pm finish, and (c) every 20 minutes on weekdays to form a 'Useful Network' route that provides a useful connection to some major suburban centres just outside Flemington. 

* Boost Sunday morning and evening frequencies on trams so intervals are never more than 20 minutes (currently 30 min maximum waits are common). 

Hawthorn

Hawthorn is well served with trains and trams. However parts have poor connectivity in some directions, especially north-south. For instance the 609 bus operates only occasionally across the Yarra. And the confusing 624 bus, while potentially a major north-south corridor linking multiple train and tram lines, operates only every 30 to 60 minutes, even during peak times. Recommendations include: 

* Split Route 624 bus at Caulfield and reconfigure as a more frequent north-south route, extending north to La Trobe University, potentially through an amalgamation with Route 548. A 15 to 20 minute 7 day operating frequency is suggested with somewhat longer operating hours. This would benefit public housing on Bills St. More detail in the Route 620 concept (Useful Network Part 41). 

* Consider scope for a north-south route from Swinburne University and Hawthorn Station operating via Denmark St and Princess St. Scope exists to continue to Alphington, Northland and potentially La Trobe University as part of an extended Route 567. The main benefit of this would be to address a structural difficulty with the current network which provides difficult north-south access. More in Networking the North.

* Boost Sunday morning and evening frequencies on trams so intervals are never more than 20 minutes (currently 30 min maximum waits are common). 



Richmond

The area around Richmond is generally well served with frequent train, tram bus services during the day. At night though the popular 246 bus drops to half-hourly. Burnley St used to but no longer has a bus, making some local cross-Yarra trips difficult. Restoring it would deliver a full network in a fairly densely populated areas. Recommendations include:  

* Commence a new Burnley St bus from Victoria Gardens to the Elsternwick area, potentially involving a modified and extended Route 603 or 604.  

* Upgrade late weeknight, Saturday and Sunday evening service on the 246 bus from every 30 to every 15-20 minutes to provide better north-south connectivity. 

* Boost Sunday morning and evening frequencies on trams so intervals are never more than 20 minutes (currently 30 min maximum waits are common). 

* End the midday loop reversal and weekday/weekend variations on the City Loop to make trains simpler to catch 7 days per week.  

Ashburton

Ashburton has the most disjointed public transport network of the six sites. It's not for lack of routes but lack of frequency, particularly on bus route 734 along High St. 734 also suffers from a weak western terminus that retards its usefuless.  Recommendations include: 

* Extend bus Route 734 to Caulfield Station. This provides access to a key railway junction, Monash University and (eventually) Metro Tunnel and Airport services. More on that here. 

* Upgrade Route 734 from every 30 to every 20 minutes, thus making it a Useful Network service. Also improve weekend frequencies and add span if desired. Again, more here.

* Upgrade SmartBus Route 903 to operate every 15 minutes on weekends on the portion between at least Doncaster and Oakleigh South. Add after 9pm Sunday service to provide a comprehensive full-time service (buses, even SmartBuses, are currently the poor relation with regard to weekend frequencies and operating hours). 

Conclusion

Described are several Useful Network expansions to serve areas earmarked for expanded social housing with some wider connectivity benefits as well.  With few exception they only involve boosts to existing routes. Are these sufficient or should more network changes be made? Please leave any comments below. 
 

Tuesday, November 24, 2020

Big Build boost but service starved in expansive state budget


The last fortnight has felt like a mini election campaign with all major political groupings releasing spending plans. Not least on public transport projects. 

Different priorities

We saw several announcements from the Government. Notable examples include a. $20m for a 3 year low emission bus trial, b. $2.2b to start Suburban Rail Loop Stage 1, c. More parking and new bus routes at Tarneit Station and, biggest of all, last Friday (d) airport rail via Metro Tunnel and faster Geelong trains. Sandwiched in between these and an announcement on easing COVID restrictions was a new charge on electric vehicles. Pre-budget releases like these from Australian governments are now so common that the budget itself, despite being kept under tight security, is almost an anti-climax. 

I discussed The Greens' Green New Deal plans here. It's a big boost for train and tram services, but, possibly reflecting the party's increasingly inner-suburban skew, does nothing for buses. Walking, unlike cycling, also gets neglected. 

Then last week the opposition Liberal Party released its transport hopes for the budget. Their theme is cost-effective smaller projects for public transport, including rail line duplications and small tram extensions. Plus, what has become an article of faith, reviving the (less cost-effective) East-West road link mega-project. I presented more detail on Sunday. Since then the Coalition released a list of 25 road/rail level crossings they'd like see removed. 

Overall, Labor is into big public transport infrastructure, big road infrastructure but not service upgrades. The coalition favours small public transport infrastructure, big road infrastructure but not service upgrades. The Greens like trains and trams (including service upgrades) plus bikes. But hardly anyone at Spring Street considers buses or walking worth making a fuss over. Which is regrettable due to the highly cost-effective and job-creating nature of improvements in these areas. 

Broader context

One can't ignore the bigger context of this budget. There's more uncertainty in this one than previous recent years due to COVID-19. At both federal and state levels the biggest economic shock since the Great Depression has resulted in huge public borrowing and spending to keep people in jobs. 

Even before that Victoria was borrowing and spending big on infrastructure, with low interest rates making the servicing of debt appear affordable and Melbourne's rapid population growth making big projects appear forward thinking. 

The high point of this thinking was before the 2018 election when the Labor state government announced the Suburban Rail Loop. This was not in isolation; public sentiment in favour of big projects had been building in the years prior. The Coalition in 2010 successfully painted itself as being competent economic managers who could run services better than Labor. However it was seen as being out of step as interest in big projects revived and interest rates were low. 

The Bracks government acted too slowly with regards to improved train timetables and reliability in 2005-7. That left an intractable problem for successor premier John Brumby (who, as treasurer under Bracks, might have resisted some spending required to make improvements happen). The 2010 election was lost before Labor's actions had time to give results. As incoming Liberal premier, Ted Baillieu was slow on infrastructure, commissioning studies but building little. Sentiment had changed when Denis Napthine took over but projects proposed were too late to be credible, let alone get built. 

Labor and Daniel Andrews did promise infrastructure and were sufficiently credible to win 2014. They, to quote their own words, 'did not waste a single moment' and built, built, built. That was rewarded by a big victory in 2018. 

Even though we have seen the results of many level crossing removals, sentiment may again be shifting, this time away from the big projects. Expectations of population growth have fallen, some expert opinion (eg Grattan Institute) is hostile, the Liberal Opposition is rediscovering the value of smaller projects and the state's mounting debt (despite low interest rates) is once again a concern. 

Still, that's for future years; this government is too committed to its promises to alter them. And, besides, only a small fraction of the funding of projects like the SRL are needed in the early years and interest rates are (currently) low enough to make large borrowings serviceable. While so many peoples' jobs remain uncertain, calls to repay (as opposed to merely service) debt won't be seen to be of immediate importance. 

Last year's budget

My write-up on 2019's state budget is here. Unlike the splashy pre-election 2018 budget it was a  dull 'business as usual' document. There was a continuation of existing capital works program and new trains and trams. Plus planning for some large projects including the Suburban Rail Loop, Western Rail Plan and Airport Rail. Not to mention the continuation of the large level crossing removal program. 

Minor patronage rises were forecast. But, as has become normal in recent years, there was very little for additional services. 2019 service growth initiatives included a handful of peri-urban buses, some of which even in late 2020 haven't started yet. 

The world of 2018 is very different to today's, with COVID-19 basically halting transport usage and  much economic activity, particularly in Victoria. We are only just getting out of this. And it remains to be seen whether some changes and patterns that established themselves during the pandemic will prove enduring. 

We do however know that the economic shock has goaded governments of all stripes to introduce expansionary budgets. Instead of aspiring to surpluses, deficits to pump billions into the economy and preserve jobs have become the rule. Low interest rates have made such borrowing more respectable than at previous times such as during our early 1990s recession. So that is what you will see in today's state budget - massive borrowing and big spending, including on public transport projects. 

Public transport in today's budget

The centrepiece is funding for the much anticipated airport rail. Even though most would only fly a couple of times a year, airport rail gets people taking like no other rail project. Many crazy schemes have been proposed and then dashed over the decades. 

We could have chosen a private consortium to build a fast dedicated line but instead opted for a standard Metro service feeding into the Metro Tunnel and through to the south-east. When you look at what gets the most use in other cities it's a good choice, with the travel time savings of the private line being less significant than the improved connectivity of the Metro line. Longer term though, capacity may be an issue, particularly with continued growth of and future electrification to Melton. The line, which includes both state and federal funding, is expected to open in 2029. 

Geelong was another part of that announcement. Geelong's V/Line trains previously went via Werribee and Newport for something like 150 years. Then they were switched to go via the Regional Rail Link and Sunshine, making Werribee purely a Metro terminus station. Patronage at Wyndham Vale and Tarneit soon grew to such an extent that trains became crowded and unreliable. And there were still some large gaps in the timetable, including during peak times. Geelong Fast Rail aims to relieve pressure by running some Geelong trains via the RRL and some via the old Newport alignment, with extra track (they don't say whether it's one or two) added between Werribee and Laverton. This should allow more dedicated trains to run to Wyndham Vale, meeting demand there and at Tarneit. Again federal funding will contribute.  

A revenue measure has been a charge on the use of electric cars. This is akin to what South Australia has announced and what New South Wales is considering. This has angered (generally affluent) electric car advocates and their supporters in The Greens who suggest it sends the wrong price signals for those wishing to convert from fossil fuel to electric. However even after the tax electric cars will still be cheaper to drive. And it could be the first movement towards the sort of road use charges necessary for governments to preserve their revenue sources as the fuel tax base diminishes. 

It's essential not to lose sight of the fact that we already extensively use electric vehicles in the form of trains and trams. Encouraging a shift from driving to public transport makes our transport less carbon intensive to the extent that our electricity generation moves to clean sources and public transport vehicle occupancy is high. We've been lagging with buses but, as previously announced, there will be $20m for a trial of zero emission buses in Melbourne, pending a future more extensive roll-out.   

That's summarised the main pre-budget announcements as they apply to public transport. 

What about the rest? 


A short cut to the budget papers is here 

On Twitter follow #vicbudget (or #vicbudget2020 )

The budget papers most important for public transport are:

* Paper 2 (Strategy and Outlook) Pages 83 - 104 for State Capital Program

* Paper 3 (Service Delivery) Pages 127 - 136, 337 - 360 and 422 - 424.

* Paper 4 (Statement of Finances) Pages 124 - 130

Salient points from Paper 3 (Service Delivery)

* Bus service improvements. $1.3m in 2020/21, ramping up to $6.3m the following year and slightly more in years after that. This is tied to asset initiatives ($2.8m 2020/21 and $1.4m 2021/22) to buy buses required to run the increased services. The most important is network reform and service upgrades on the Mornington Peninsula. A Mernda - Craigieburn bus is also mentioned, with accelerated delivery. Some outer suburban secondary colleges will get improved school special services. 

* $3m this financial year on a tram corridor strategy. This will consider network reform to optimise the use of both existing and next generation trams. Currently we have cases of high floor trams operating on routes with many accessible stops and vice versa. One would hope that a review would, amongst other things, maximise network accessibility with what we currently have. 

* $5.5m on Caulfield Rationalisation. This will segregate the Frankston and Dandenong lines with claimed speed and timetabling benefits. 

* $4m for zero emissions bus fleet, with $1m spent in this financial year. Added to this is $16m in 2021/22 under the asset initiative. 

* The West Gate Punt service will be continued. 

* $438m is recorded as spent on public transport's coronavirus response. This was basically to keep the system running (noting reduced fare revenue) and increase cleaning. 

* $2.8m in first year on ticketing strategy. 

* Expenditures for timetable planning - between $0.5 and 1m each year. Mainly for rail. 

* $1m on public transport network safety and resilience. This is associated with $34m over four years for the asset component. This is about upgrading substations in bushfire prone outer parts of the rail network. 

* $231.4m will be spent over four years for the car parks at stations initiative. The biggest proportion ($100.9m) will be spent in a 2021/2022 pre-election blitz. This is listed as an asset initiative under train services. 

* $276.5m over four years will go to the Dandenong rail corridor. This will support high capacity signalling, the High Capacity Metro Trains and speed things at Dandenong. 

* 100 Next Generation Trams will be ordered in the next four years, costing just under $1.5b. We don't know what year the expenditure for this will be included in.   

* Suburban Rail Loop includes the previously announced $2.2b in the next four years for preparatory works including project work, initial land assembly and relocation of utilities.  

* Page 339 says how much we spent on running various train, tram and bus services. 

* Outputs (from Page 342) describe expenditure and patronage. Of note is the large falls in patronage due to the coronavirus. That started to hit usage from about March 2020. The 2020/21 targets assume a standard year, ie exclude the coronavirus impact that we've already had this financial year. 

* Page 350 includes a target of just two level access tram stops to be upgraded. 

Salient points from Paper 4 (Statement of Finances)

* Page 17 has key economic assumptions, including an economic rebound, recovering population growth and a fall in unemployment post-coronavirus. 

* Contingent liabilities. Remember Donald Rumsfield going on about 'known knowns, and unknown knowns etc'? Budgets are asked to make projections for things that may or may not happen. Page 188 lists some. Some are associated with transport operation and projects. These include land acquisition, partnership agreements (ie operator franchises), a claim re patronage at Southern Cross Station and issues with the Metro Tunnel construction. 

* Page 212 lists all the major government infrastructure projects on the go. It's worth reading this to refresh one's memory. Those related to public transport include: 

• 75 level crossing removals by 2025;
• Additional VLocity trains;
• Caulfield to Dandenong conventional signalling and power infrastructure upgrade;
• City Loop fire and safety upgrade (Stage 2) and intruder alarm;
• Courts case management system;
• Cranbourne line duplication;
• Cranbourne-Pakenham and Sunbury line upgrade;
• Frankston line stabling;
• High Capacity Metro Trains Project;
• Hurstbridge Line upgrade – Stage 2;
• Melbourne Airport Rail;
• Metro Tunnel;
• More E-Class trams and infrastructure;
• Murray Basin Rail Project;
• New trains for Sunbury;
• Regional Rail Revival;
• Shepparton Corridor Upgrade – Stage 2;
• Suburban Rail Loop;
• Tram procurement and supporting infrastructure;
• Waurn Ponds Track Duplication – Stage 2;
• Western Rail Plan;

Summary

Like the 2018 budget, this has been a big budget for a small number of large public transport infrastructure projects. This has been helped by federal funding. These projects will be city-shaping in their impact. In the case of airport rail it delivers on something that has been talked about for years, but, until now, not funded. The zero emission bus trials could be the start of a long-term transition towards a low carbon future. While it might be imperfect, the charging of electric car usage may be a tentative step towards a workable post-fuel pricing mechanism. The state government need some sound revenue sources to fund what it does and, given the negative consequences of driving regardless of propulsion, there could be many worse than  taxing cars. 

Again overlooked has been services, with only minor (but still welcome) bus initiatives on the Mornington Peninsula and at Craigieburn. Melbourne passengers will continue to wait up to 30 minutes for evening trains at times where Sydney passengers have only 15 minute waits. Many neighbourhoods will remain without 7 day bus services, or even, in some cases, on Saturday afternoons. The new tram order is good but stops need to support them to provide genuinely accessible service. The pace here, too, has been very slow. Meanwhile funds seem limitless for station car parking, despite the very high per user cost and the opportunity for higher value land uses (that return profits rather than costs) such as housing near stations. 

Right now cost-effectiveness may not be number one criterion of whether a transport project gets approval. But as debts mount and finances tighten then circumstances may change. Therefore, despite these being trying times for advocates, they should continue their push for high-return local infrastructure and service based upgrades to provide a truly useful, comprehensive and connected network. 

Sunday, November 22, 2020

The Victorian Coalition's wish list for the 2020 budget


Melbourne on Transit and others have said little about the state opposition's suburban public transport policies. 

Mainly because there's been little to go on.  

Their bus service upgrade policy, released election eve 2018, was a classic example. 

It had a dollar figure. But there were no maps. Nor even concrete proposals. Hence candidates couldn't sell it and no one knew who would benefit.  

So what could have been a worthwhile measure that needled Labor in marginal seats got zero airtime because it came out too late and had no specifics. 

Hence the first Andrews government, with its mediocre record on suburban bus reform and service improvements (as opposed to big infrastructure) got off lightly in an area that it should have been hammered on if the opposition was more alert. 

We are now almost exactly half way between the Coalition's 2018 electoral routing and the 2022 poll. 

Spring Street watchers know about Tim Smith's bats or Bernie Finn's cross-eyed meme. They also know that building the East-West Link road tunnel is an article of faith within the Liberal party. But the rest, especially with regard to public transport policy, is pretty much a blank sheet. No one knows what they stand for. 

Sure, there's the tweets about train delays, project cost blow-outs and the odd corruption scandal. Any opposition would do that. But to be credible they also need to be seen as an acceptable alternative that can be trusted to govern. This requires community engagement and policy development.

Suggestions for Labor's 2020 budget 

The first hints of policy with regard to public transport came out on Thursday from transport shadow minister David Davis MP. These came in the form of three releases, as below: 

1. Duplicating single metropolitan train tracks

Duplication is stated to be the best way to increase capacity and reliability on our trains. Sections the Coalition is calling on Labor to duplicate include: 

* Belgrave line between Ferntree Gully and Upper Ferntree Gully

* Lilydale line between Mooroolbark and Lilydale

* Alamein line between Ashburton and Alamein

* Hurstbridge line from Greensborough to Eltham 

* Upfield line between Gowrie and Roxburgh Park, including a connection to the Craigieburn line.

These cost-effective projects are compared favourably with the Suburban Rail Loop that is considered a pie-in-the-sky mega project. I'll leave it to the rail wonks to consider their relative merits. 

2. 'Missing link' tram extensions

The Coalition is also asking for the 2020 budget to include tram extensions. Due to historical competition between railways and tramways, trams, particularly in the inner south-east suburbs, finish about a kilometre short of stations. This limits the ability to serve local multimodal trips. I listed  examples here. 

Drawing on proposals from the Rail Futures Institute, the following extensions are suggested: 

Route 3: extended from East Malvern (Darling Road) terminus 0.8 km to EAST MALVERN STATION

Route 5: extended from Malvern (Burke Road) terminus 1.4 km to DARLING STATION.

Route 19: extended from North Coburg (Bakers Road) terminus 0.7 km to MERLYNSTON STATION

Route 67: extended from Carnegie (Koornang Road) terminus 0.9 km to CARNEGIE STATION

Route 48: extended from North Balwyn terminus 0.9 km to GREYTHORN (Shopping Centre)

Route 86 (existing Route 109): Station Pier, Port Melbourne – 200m of new track crossing Waterfront Place to a new twin-track interchange/terminus at the Station Pier gate.

Route 57: extended from West Maribyrnong 3.4 km to AVONDALE HEIGHTS (Buckley Street)

Also recommended is a new tram interchange at Clifton Hill Station. 


The least important extension of the above is the 109 since (a) it is just 200 metres and (b) since it was suggested by Rail Futures, Station Pier has lost the Spirit of Tasmania ferry to Geelong. The reference to Route 86 arises from other tram network reform Rail Futures propose. I don't even know why you'd bother; the existing 200m walk is likely quicker than what is considered acceptable for transfers between metropolitan and regional trains within a station like Southern Cross, or what is routinely added to the walks of those getting to busy stations (like Frankston) that lack multiple entrances. I'm also not sure about the Route 19 extension as the tram and train are closely parallel and mostly do not serve unique catchments. 

Other extensions have more merit. By weaving together 'loose ends' they make the network much more useful for non-CBD trips by reducing walking and backtracking. Again these 'missing link' projects are suggested as alternatives to the Suburban Rail Loop. 

3. Regional and outer suburban train upgrades

What is referred to as 'Labor's major project budget blowouts' and the Suburban Rail Loop is blamed for delays on other projects that could have been started. These include:   

* Extension of the Frankston line to Baxter (more here)

* Extension of the Cranbourne line to Clyde 

* Commencement of the Rowville Rail plan including linkage through Chadstone and Monash University

* Extension of rail system to Wallan 

* Electrification and expansion of rail in Melton and Wyndham

* Implementation of Western rail plan

Note that the above came out before the premier's announcement yesterday about the airport rail alignment and altered arrangements for Geelong. 

Evaluation

It is good that the Coalition is moving towards having policies for public transport. The reason why I don't think these lists yet quite constitute policies is that they are suggestions for Labor in next week's budget. 

They don't actually promise that a 2022 O'Brien government would implement them. That gives some flexibility in case they want some different policies in two years and freedom from having a commitment recorded (which could prove troublesome if broken).  

Maybe the Liberals were chastened by their last time in office where rail projects the public thought of as being promises were not started? Maybe two years prior is too long to expect since things can change, so it's better not to promise anything at this stage? If we go back to the last term, even proposals made the year before the election (such as David Hodgett's very good plan to boost trains on most lines to every 10 minutes) didn't make it in to the 2018 campaign for reasons unknown. 

If you like the above policies released by Mr Davis and have a local coalition member (especially in a marginal seat) it wouldn't hurt to ask for a firmer commitment. 

What about their content? It would appear that the Coalition has been listening to people like the Rail Futures Institute. And possibly the Grattan Institute who recently warned about the perils of mega-projects. This is also good as a concentration on mega-projects, possibly to the exclusion of more cost-effective smaller projects, is arguably an Andrews government failing. Although the East-West road link, the Coalition's own mega-project, remains a protected species despite the broader population being indifferent for two elections running.

There are two main areas where the Coalition releases are like those put out by The Greens under the 'Green New Deal' banner. 

First of all the timing. Having held government less than six years ago they would know that budgets take longer than a few days to knock up. Like the Greens proposals there is no way the government would modify its budget to include any at this late stage.  

Secondly buses and walking are invisible. There's nothing for them in either the abovementioned Liberal or the Green New Deal policies. Despite improvements for these modes often being quick, local, highly cost-effective and job creating. The coalition also neglects cycling. 

Greens could argue (on self-interest grounds) that buses are of limited relevance to their inner-suburban train and tram rich constituencies. And since losing all but one of its Legislative Council seats in 2018 the party is increasingly geographically concentrated. Its constituents are thus more and more removed from what John Howard used to call 'mainstream Australia'. 

The Liberals are in a different boat. With even traditional inner suburban seats under threat (sometimes from The Greens) its constituency is based increasingly in outer areas. And voters do not necessarily have mega-high incomes. These are the same areas that have no trams and sparse train services. Buses then are relatively more important for constituents but the Liberal policy-setting elite (though a different type of elite to Greens elite) are equally blind to buses. 

This is despite advocacy groups like BusVic (who could offer help with policy) being seen to be closer to the Coalition than Labor in recent years. And a seat-by-seat list of bus issues and cost-effective upgrades, concentrating on politically marginal areas, can be found here. So there would be no shortage of information and advice available when developing plans. 

As well as similarities with The Greens, there are unfortunate parallels with Labor. I say 'unfortunate' because an opposition should be different where the government is wrong. 

Take off-peak train services. Both the Kennett and Baillieu/Napthine coalition governments greatly improved off-peak train service frequency in the east and south-east suburbs. Ditto for NSW Liberals in Sydney. Andrews Labor, being infrastructure focused, has done little of this, shelving the big service upgrades proposed in the 2012 Rail Network Development Plan. 

Oddly, Davis appears reluctant to draw inspiration from his predecessors and pick up the ball where Labor dropped it. Hence even badly needed low-cost off-peak train frequency upgrades, like Belgrave and Lilydale, serving seats that the Liberals must win to form government, don't rate mentions in the releases. 

By neglecting service (like Labor) the coalition's budget suggestions are still infrastructure based but with smaller projects on the public transport side (the big roads projects remain). The most cost-effective mix for public transport is likely to be a mix of smaller infrastructure projects combined with service upgrades. The Coalition hasn't shown signs of understanding this yet. And if you want even bigger patronage gains, mode shift for public transport and a better budget bottom line then you'd also lay off the big road projects.  

Conclusion

Some of the Coalition's proposals have merit and would strengthen and better connect the network. It wouldn't be a bad idea if Labor stole some. Will Labor copy and paste them into Tuesday's budget? With an already full agenda it's unlikely but time will tell.