Motivations for developing suburban subcentres
varies. It could be to relieve pressure on the crowded CBD, allow more jobs
nearer where people live or to make optimal use of transport infrastructure
with more bidirectional trips. Or, more cynically, it could be to salvage some
benefits from previous bad land use planning decisions (eg locating Monash
University’s Clayton campus in an unserviced paddock) or benefit local
landholders and developers.
Clusters and their transport network needs
About 12 years ago Melbourne@5 million came out.
It defined a number of ‘national employment and innovation clusters’. These
included precincts around major universities and established suburban centres,
though there were a few greenfields ones, like Werribee East, as well.
The term ‘cluster’ is important. They are not
centres. With a centre you expect a small area that is reasonably walkable from
end to end. Whereas ‘clusters’ are not so dense. Parts can be five or more
kilometres from one another. This greatly affects how we should plan and run
transport to ensure good access within as well as to it.
Box Hill and Dandenong are established suburban
centres. They typically have a train station with a bus interchange close by.
Bus routes terminate at the interchange. In all but one case if you wish to
travel from slightly south to slightly north of the centre you will need to
take two buses. Buses may twist and turn to enter the interchange, be
infrequent and be difficult to understand. Even a short 2km trip within a
centre precinct could take 30 minutes or more, with walking often faster due to
indirect route alignments and low frequency.
Trams in the Melbourne CBD follow a different
model. For a start most through-run. Hence trams from the south will pass
through the CBD, often terminating a couple of kilometres north at Melbourne
University. Similarly trams from the north finish at the south end of the CBD
(or even go well beyond). The same applies for trams from the east that finish
in western areas like Docklands or Port Melbourne. Although trams aren’t the
fastest mode their routes are mostly direct with no deviations into off-line
interchanges. And if people want to change then they alight at a corner and
change to another tram, that, because of the overlap of routes, is never far
away.
NEICs such as Sunshine are several times bigger than the Melbourne CBD in land area. Therefore they need a CBD style of
service. You can’t just provide good service at one point, such as just around
a station. Instead it needs to be well connected within itself with routes that
travel from one end to the other without deviating in the middle. Plus they
should extend at least slightly into hinterland areas where more intensive
residential development can support the cluster’s employment and other
functions.
This means a network of direct and turn-up-and-go routes with easy
interchange between them. An acceptable service standard might be every 10
minutes for connections to surrounding centres and every 3 to 5 minutes for
short trips within a centre. While a 5 minute service seems high, it is
appropriate for a dense area with short trips where waiting would otherwise be
an excessive component of total travel time.
Existing Sunshine 10 and 20 minute networks
Sunshine is quite well served with train and bus services
operating every 20 minutes. However nothing runs every 10 minutes or better
outside peak. The best it gets are a few routes such
as the 216, 220, 410 and 903 every 15 minutes on weekdays and as infrequent as hourly on weekends. The 903 SmartBus is the highest profile route but its 30
minute weekend frequency and less useful destinations make its benefits less
than they should be. However it is the only route that travels both sides of central Sunshine in a pattern that could be replicated more widely.
Here are my ten top things Sunshine’s public transport needs if it is to fulfill its potential as a NEIC and make itself accessible to the wider surrounding region. Most are relatively modest service upgrades possible within three years with the political will and funding.
1. Trains
every 10 minutes to Watergardens. Current off-peak trains are only every 20
minutes (day), 30 minutes (night) and 40 minutes (Sunday morning). The template
for service should be what the Frankston line has had since 31 January, ie a 10
minute daytime Monday – Sunday service and a 20 minute maximum wait early
morning and at night. Key beneficiaries of the improved access include Sunshine
Hospital and Sunshine CBD. The importance of this upgrade cannot be overestimated; without it waiting time can exceed travel time for many trips.
2. Ballarat Rd MegaBus/future light rail between Sunshine and the CBD. Ballarat Rd is home to two VU campuses and will be near the proposed new Footscray Hospital. It has several bus routes along it but none have the high frequency and profile needed. Also the corridor’s main routes like the 220 and 410 don’t consistently run along it. The MegaBus would deliver a single simple route with an all day 5 – 10 minute frequency between Sunshine, Ballarat Rd, Footscray, Docklands and the CBD. It would have high quality stops and bus priority. Quiet electric buses could run along it within two years with potential for light rail within ten years. More here.
3. SmartBus to Highpoint. Rerouting the 903 orbital to run via Highpoint would provide a high quality link from Sunshine to Highpoint and Essendon via Braybrook, better connecting local activity centres. The cost of doing this is negligible but there would need to be some local bus reforms. More here.
4. Fast airport bus. Airport rail is proposed but won’t start until 2029. We could start a high quality limited stops fast bus much sooner. This establishes travel patterns early and increases the attractiveness of Sunshine as a destination for business. Plus it would slash airport travel times for a large slice of western Melbourne including the fast growing Wyndham, Melton and Geelong areas with connections from upgraded train services. More here.
5. Geelong and Wyndham Vale rail service upgrade. Current waiting times can blow out to as much as 40 minutes at night and on weekends. The first upgrade should add trips so that waits never exceed 20 minutes at least as far as Wyndham Vale. The next stage could further boost Wyndham Vale’s frequency to every 10 minutes.
6. Melton rail service upgrade. The 31 January 2021 timetable added many trips. However there remain some long gaps and weekend service is not as good as it should be. An upgrade could boost weekend and evening service so that maximum waits at Melton are capped at 20 minutes. This would be a precursor to Melton electrification, with Melton eventually getting a full 10 minute service.
7. Local bus network reform and simplification with 10 or 20 minute maximum waits. Initiatives such as the Highpoint SmartBus and the Ballarat Rd MegaBus could provide the catalyst for reform to other local bus routes, although some could be done earlier. Some would have very low costs. Potential upgrades include:
·
Route 216 upgrade to every 10 min weekday, 20
min night and weekends.
·
Route 410 reroute off Ballarat Rd to operate
consistently operate via Churchill Av (currently 410 follows an inconsistent route with an hourly deviation). Operate a consistent 15 min peak/20 min
off-peak 7 day service with longer hours.
·
Route 428/429 consolidate to operate as a single
simplified route 428 every 20 minutes 7 days per week. Service could commence
north of station to improve main street access. More here.
·
Route 408 upgrade with longer hours and Sunday
upgrade to every 20 minutes. Would improve access to Sunshine Hospital. Potential
western extension along Furlong Rd to Brimbank SC for improved hospital access
in conjunction with other network changes.
· Route 418, 423 and 424 upgrade with longer hours and boosted frequency to every 20 minutes. Would improve access to St Albans and Sunshine Hospital area. Also longer hours and higher weekend frequency for Route 425.
·
Route 426 upgrade to every 20 minutes to
Caroline Springs Town Centre. This would provide a simpler Ballarat Rd service
connecting with trains at Albion. Potential to merge with Route 410 to
provide east-west route through Sunshine.
·
New Watergardens – Sunshine route via Sunshine
Av. Formed by extending Route 419 to Sunshine with Route 406 extended west to
St Albans to serve Main St East. Would operate every 20 min or better 7 days
and better connect Sunshine with close in areas to the north.
·
Extended hours on Route 420 to midnight. Peak
frequency increased to 10-15 minutes.
·
Longer operating hours on Route 400 between
Derrimut and Sunshine.
·
A new Sunshine – St Albans bus route via St Albans
Rd for improved local access as the precinct develops. Potential to operate near Sunshine Hospital and via Victoria University St Albans. This could be one of the St Albans local routes (eg 425) extended south.
·
Improved industrial area coverage to Laverton
North via a new route, potentially to Tarneit via Dohertys Rd. This could help create a job ready network for improved access to local employment.
8. Sunshine Station rebuilding and revamp. Although the station is relatively new, local walking and biking connectivity in the area remains poor, especially across the rail corridor near Sunshine Station. The south side has huge potential if connectivity was better. An ambitious concept suggested by some could be to move the station about 150m to the north-west to bring it closer to the major activity centre at Hampshire Rd and have the buses between where the tracks diverge. Multiple entrances and connecting walkways, at both ends of the platform, are essential to maximise walking catchment (something Melbourne is notoriously bad at doing even for major stations like Frankston and South Yarra).
9. Albion Station upgrade. Currently it’s a dump. A southern entrance and connection onto Foundary Rd could make it a second station for Sunshine CBD. Bus stops would also be improved for better waiting conditions for those using connecting Ballarat Rd buses.
10. Various walking and cycling access improvements. To improve access along and across roads.
11. (added later) Bendigo trains to stop at Sunshine. Again a major boost to NEIC access.
This has been my wish list for better transport
in Sunshine NEIC. Most are relatively short term, or at least can be if there
was the same will to introduce bus upgrades as implement larger more infrastructure-based projects. Have I
left any off or are there some that you think are unnecessary? If so please
leave your comments below.
Sunshine NEIC is in the seat of Footscray (Katie Hall MP) and St Albans (Natalie Suleyman MP). Both are regarded as safe Labor seats.
See other Building Melbourne's Useful Network items here
1 comment:
Some of the ideas in this ended up in 'Service Step-ups for Sunshine' produced by the Victorian Transport Action Group. Details of that are here:
https://twitter.com/MelbOnTransit/status/1445483200118018052