Tuesday
Wednesday
Are you being served? Commentary on the service aspects of public transport in Melbourne, Australia.
Covers networks, routes, timetables, planning, co-ordination, information, marketing and more.
Several major changes to Melbourne bus routes occurred today. The most important was the introduction of Route 902, our second orbital SmartBus route. The photos below are of the bus on its maiden end-to-end trip, starting at Chelsea and ending at Airport West, approximately 76km or over three hours later.
Chelsea (terminus)
Springvale
Glen Waverley
Nunawading
Doncaster Shoppingtown
Eltham
Greensborough
Campbellfield
Broadmeadows
Airport West (terminus)
Observed patronage was low at the start of service (6am on a public holiday) but steadily built up during the day. Many people were seen exploring the route, taking advantage of the two week's free travel.
Several other routes were created or altered as a result of Route 902's introduction. These include Route 281 (shortened to Templestowe to avoid duplication with Route 902 and extended to Deakin Uni on weekdays), Route 735 (extended to Forest Hill Chase and Nunawading to compensate for the deletion of 888/889) and Route 858 (serves Edithvale and Chelsea Heights as a replacement for the 888 and 889). In addition National and Ventura introduced new timetables and shortened Routes 200 and 203 to Bulleen terminus (Routes 305 and 903 cover the Bulleen - Doncaster Shoppingtown portion).
Has anyone looked at poster cases at railway stations lately? If so one will see several different designs erected at various times. Careful inspection will reveal that different tools are required to open and update the contents.
This apparently minor detail can give hints about how passenger information is delivered to the platform and the extent to which this represents conscious design or a 'grafting on'. And what is regarded as standard practice for the architect or design engineer might not be favoured by administrators, and vice versa.
Different styles of poster case at stations
An engineer required to design passenger information at stations would likely specify just one design of poster case. All would be a common size so that savings can be made with bulk purchase of materials. And the same basic design would be reproducable in the future if needed for new or upgraded station. Standardisation implies inflexibililty in one area (unimportant to passengers) but permits flexibility elsewhere (to optimise the sequence of information presented to passengers) as posters can be swapped between cases if needed.
As an example, a government-funded station car park extension may have been finished long ago so promotion is no longer needed (the blank case pictured previously advertised this). Or the Myki ticketing system will eventually be as established as Metcard is today, so promotion space for it is no longer necessary. Meanwhile a rail occupation may require numerous additional posters. This is especially if it coincides with public holidays and special events. In such instances, all poster cases at a station are needed to fully inform passengers, and there is a risk that (say) a ticketing poster may occupy space needed for (more important) service information. Having standard poster cases should also cheapen maintenance as the range of replacement parts needed would be less.
The engineer would likely also specify one standard opening tool for all cases at the station. He would know that this assists the railway staff member whose job it is to replace posters as they would only need to carry one tool and not three. Needing only one tool reduces the chance of a tool being forgotten or lost and thus the chance of a poster or timetable not being able to be updated. Hence a simpler system based on one type of poster case accessible with one key should also be reliable than where there is a variety.
Other professionals would also agree, though for different reasons. The architect would want some unity of design, rather than the tacked-on look of many additions to stations. And the chance that non-standardisation causes some cases to be empty would worry the merchant or marketer who sees blank shelves or cases as selling opportunities lost. The passengers, most of whom are not in the above professions, would likely prefer whatever provides the most reliable information when they want it.
A differing perspective may be offered by the manager or bureaucrat. Managers might favour speed and short-run budgets compared to the engineer's standardisation or the architect's design coherence. Well defined goals such as an individual project's delivery may trump broader issues such as the passenger experience or sequence of information received. Those ordering new poster cases may work outside the railways (eg in ticketing) and could even want 'their' posters to have a different style and key. Manufacturing a short run just to continue an existing design may prove expensive, given there are no railway workshops anymore. Thus it could be more rational for managers to order poster cases off the shelf, even if they are a different size or uses different opening methods to cases already on the platform (photos below).
Standard type (used by train operator)
Promotional (used by Department of Transport)
Myki (used to promote new ticketing system)
The photos show that the manager or bureaucrat perspective has generally prevailed over that of the design engineer's. It also indicates that information may be delivered in seperate 'channels' or 'silos' (marked 'railways/existing ticketing', 'transport projects' and 'new ticketing') through different styles of poster cases for each.
This is mostly not too much of a problem. However instances can arise where one area (eg new transport projects today, rail occupations tomorrow) requires more information than poster cases reserved for it. In addition poster placement may not perfectly align with passenger information needs at different locations around the station, and the use of different poster cases may limit flexibility. Also as noted before, having a variety of poster cases and opening tools may have implications for overall system simplicity and thus information reliability.